west bengal
- construction new campus for iiit, kalyani. sh - sitc of 250 kwp online grid interactive roof top solar photovoltaic power plant, solar hot hot water system and r.o plant, (balance work of solar zero export device for existing 250 kwp solar plant of iiit,
- Deadline : 04 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
delhi
- rmo dg set installed at hyderabad house, new delhi. (sh: operation of 380 kva dg sets)
- Deadline : 04 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
west bengal
- replacement of worn out parts of 1 no. 8 passenger (otis) lift including comprehensive maintenance at cpwd holiday home, gangtok, sikkim.
- Deadline : 04 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
west bengal
- construction of new campus for iiit, kalyani. sh - sitc of 250 kwp online grid interactive roof top solar photovoltaic power plant, solar hot water system r.o plant. (balance work of solar structure body earthing with copper wire for existing 250 kwp sola
- Deadline : 04 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
west bengal
- supply, installation, testing commissioning of roof top solar power plant at office building of mercantile marine department, haldia, east medinipur.
- Deadline : 02 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
chandigarh
- sitc of grid connected rooftop solar pv generation panels in residential complex at ag bungalows no. 139, 140, 141 and 142, sector 24-a, chandigarh
- Deadline : 16 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
uttar pradesh
- sitc of silent type 82.5 kva dg set at gpra kendranchal colony, pocket-i, allahabad.
- Deadline : 03 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
kerala
- comprehensive maintenance contract of 1 no kone make mono space passenger lift no. 40185113, installed at income tax department building, kowdiar, trivandrum.
- Deadline : 03 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
haryana
- armo of elect. substation, generator fire alarm at income tax office building, rohtak.
- Deadline : 02 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
uttar pradesh
- construction of office building i/c iei fans, fire fighting, fire alarm, sub station, cctv, lift, dg set, ups, solar pvpgs, vrv/vrf, lan, ip based epbax and horticulture work for kvic at gorakhpur (u.p) (sh: - residual work to complete the building)
- Deadline : 02 Dec 2025
- Updated : 28 Nov 2025
- Value : See Document
Subscribe / Membership
