telangana
- supply, installation, training and commissioning of usrp x 310 kit with daughterboard and accessories with two years onsite all inclusives warranty period to nit warangal as per the specifications attached in section - 3.
- Deadline : 23 Dec 2025
- Updated : 03 Dec 2025
- Value : See Document
telangana
- supply, installation, training and commissioning of 2 channel digital vibration controller (built in signal conditioner) with controller software with one year onsite all inclusives comprehensive warranty period
- Deadline : 23 Dec 2025
- Updated : 03 Dec 2025
- Value : See Document
delhi
- desilting of conveyance system rising main from lifting station to cetp of 600 mm dia having 1.8 k.m. length at wazirpur by using super sucker machine, jetting machine and tanks etc. including safety gears and safety equipments etc
- Deadline : 08 Dec 2025
- Updated : 03 Dec 2025
- Value : 17.42 Lac
andhra pradesh
- development of synthetic acrylic floor tennis court (04 nos full court and 01 nos half court) including poles, nets, chain link fencing etc., including allied civil works viz retaining wall, toe walls, drainage system, seating gallery, access staircase, c
- Deadline : 09 Dec 2025
- Updated : 02 Dec 2025
- Value : See Document
uttar pradesh
- installation of kiran fighter airframe at nsti, kanpur.
- Deadline : 09 Dec 2025
- Updated : 02 Dec 2025
- Value : See Document
uttar pradesh
- ar and mo gsi office building at aligaj lucknow during fy 2025-26 (sh balance work)
- Deadline : 09 Dec 2025
- Updated : 02 Dec 2025
- Value : See Document
uttar pradesh
- resurfacing of existing sub-road of block-iii and langra aam area of main campus at icar-cish rehmankhera, lucknow
- Deadline : 09 Dec 2025
- Updated : 02 Dec 2025
- Value : See Document
multi state
- making arrangement for republic day celebrations 2026 (sh: making the rcc platform in front of presidential dais for placing of br containers for presidential dais at kartavya path)
- Deadline : 05 Dec 2025
- Updated : 02 Dec 2025
- Value : See Document
maharashtra
- electrical renovation work of additional directors chamber at swasthya sadan, cghs, mukundnagar, pune.
- Deadline : 09 Dec 2025
- Updated : 02 Dec 2025
- Value : See Document
delhi
- replacement of 02 nos of 13 passenger lifts at msib complex 35 s p marg new delhi (sh misc civil works)
- Deadline : 09 Dec 2025
- Updated : 02 Dec 2025
- Value : See Document
Subscribe / Membership
