himachal pradesh
- extension of roofing for entrance canopy and replacement of damaged roof ceiling including miscellaneous civil repair work at mahashu bhawan, ihm kufri, shimla (h.p.)
- miscellaneous
- Deadline : 30 Mar 2023
- Updated : 25 Mar 2023
- Value : See Document
west bengal
- 1. replacement of outside soil lines, rain water pipe lines, closing of fanlight area by brick work, roof treatment work for lift machine room, repair of structural glazing work & repair of lift pit, replacement of floor tiles in 3rd floor and necessary painting works acharya prafulla chandra bhavan, dk-7/1, sector-ii, salt lake city, kolkata-700091 during the year 2022-2023. 2. renovation and reorientation of proposed chamber of dpi under education directorate, govt. of west bengal, at 6th floor of bikash bhavan, east block, kolkata-700 091 during the year 2021-2022. - work to be executed during the year 2022-2023. (building and s&p works)
- construction, infrastructure, civil work
- Deadline : 11 Apr 2023
- Updated : 24 Mar 2023
- Value : 36.64 Lac
delhi
- repair of ceiling and water proofing of roof and other associated civil work in cisf kota, behind annexe building, upsc, shahjahan road, new delhi.
- miscellaneous
- Deadline : 28 Mar 2023
- Updated : 24 Mar 2023
- Value : See Document
west bengal
- extensive repairing renovation of main building and admin. building of kendriya vidyalayta-i, salt lake, kolkata (sh: face lifting, retrofitting, repairs of external walls balance work, renovation of toilets and adjacent rooms, re-flooring of damaged class rooms, tiles fixing in physics, chemistry, biology and library room, plinth protection of main building field side, replacement of damaged doors and , external and internal painting, roof treatment and the misc. works including electric instal
- miscellaneous
- Deadline : 28 Mar 2023
- Updated : 24 Mar 2023
- Value : See Document
west bengal
- chittaranjan national cancer institute - thorough repair, renovation & painting including replacement of damaged ci pipe to the outside portion (east and south side only) including east side covered shed, dg set roof and west side up gradation of research building. cnci hazra campus during the year 2022-23
- construction, infrastructure, civil work
- Deadline : 29 Mar 2023
- Updated : 13 Mar 2023
- Value : 75.65 Lac
- 1