telangana
- operation and maintenance of e m installations, in non residential buildings at meteorological department, begumpet, hyderabad.- operation and maintenance of electrical and mechanical services for iei specialised services of 11 kv substation, operation of
- power, power plants
- Deadline : 27 Dec 2023
- Updated : 21 Dec 2023
- Value : See Document
delhi
- sitc of on grid roop top 100 kwp solar power plant at iittm gwalior mp sh l sitc of 50 kwp grid roof top solar power plant at auditorium
- power, power plants
- Deadline : 03 Jan 2024
- Updated : 28 Dec 2023
- Value : See Document
gujarat
- supplying, installation, testing and commissioning of 50 kwp on grid solar photovoltaic power plant at income tax office building, jamnagar
- power, power plants
- Deadline : 03 Jan 2024
- Updated : 28 Dec 2023
- Value : See Document
rajasthan
- sitc of 40 kwp on grid solar pv system at nsso bhawan, jaipur
- power, power plants
- Deadline : 09 Jan 2024
- Updated : 03 Jan 2024
- Value : See Document
andhra pradesh
- providing 15 kwp interactive grid type solar pv power plant at national institute of nutrition, chandragiri, chittoor, ap.
- power, power plants
- Deadline : 10 Jan 2024
- Updated : 04 Jan 2024
- Value : See Document
maharashtra
- construction of ecgc office building at plot situated at village gundavali m v road andheri e mumbai. sh : installation of grid interactive rooftop solar pv plant on the terrace
- power, power plants
- Deadline : 12 Jan 2024
- Updated : 08 Jan 2024
- Value : See Document
uttar pradesh
- construction of faculty block (g 2) including iei, fans, lift, air conditioning, cctv system, solar power generations system and horticulture work at iim campus, lucknow (u.p.) (s.h: finishing red coloured frp door shutter and frame into white covering el
- power, power plants
- Deadline : 12 Jan 2024
- Updated : 08 Jan 2024
- Value : See Document
rajasthan
- sitc of 40 kwp on grid solar pv system at nsso bhawan, jaipur
- power, power plants
- Deadline : 12 Jan 2024
- Updated : 09 Jan 2024
- Value : See Document
madhya pradesh
- provision of solar panel at guest house at icar indore.
- power, power plants
- Deadline : 27 Jan 2024
- Updated : 20 Jan 2024
- Value : See Document
madhya pradesh
- provision of solar panel at guest house at icar, indore
- power, power plants
- Deadline : 05 Feb 2024
- Updated : 29 Jan 2024
- Value : See Document